Project Description
The project formed a part of Ballymun Regeneration PPP Project and consisted of the construction of a sports hall, fitness gym and ancillary hall for aerobics and other classes. Also included in the development is a play room for the children, a wet and dry changing area, sauna and steam room. Two 25m four lane swimming pools are constructed with a waiting and view area with a learners’ swimming pool to one side. Children are also catered for with the wet play feature and two drop slides.
Barrett Mahony Consulting Engineers provided full Civil / Structural Engineering Services from project conception stage through developed design stage (preparation of drawings and design calculations), tender stage (assistance to QS in the tendering process) to construction (monitoring on site) and handover stage.
Project: Ballymun Swimming Pool
Client: Dublin City Council
Capital Value: €5m
Dates: 2002-2006